Facilities and roadmap Proposed Layout conceptual

A proposed three-phase facility would grow only when financing, demand, permits and evidence allow it, and no site has been selected

Phase I would be a laboratory core; pilot and commercial capacity would follow only after their gates. Every size, date and layout here is a planning proposal.

18,000 sq ftPhase I laboratory core, earliest 2027
42,000 sq ftcumulative after Gate 1 adds a pilot plant, earliest 2029
72,000 sq ftcumulative after Gate 2 adds commercial operations, earliest 2031
4 conditionsat every gate: financing, demand, permits and evidence

Status. No site, lease, permit, equipment order or quotation exists. Dates are the earliest proposed timing, not commitments.

Three phases

Later phases would add throughput and scale, not new science

The laboratory core carries the scientific work from the start. Pilot and commercial phases add capacity once demand and evidence justify it. Southern California is the target region.

The laboratory core comes first; each gate adds pilot or commercial capacity on top of itProposed phasing
Capabilities added in each proposed phase and carried through later phases: the laboratory core in Phase I, pilot process capability in Phase II after Gate 1, and commercial capacity in Phase III after Gate 2Phase I · Laboratory coreProposed 202718,000 sq ftGate 1Phase II · Pilot processAfter Gate 1 · earliest 202942,000 sq ft cumulativeGate 2Phase III · CommercialAfter Gate 2 · earliest 203172,000 sq ft cumulativeAnalytical coreAnalytical core: from Phase IMicrobiology and stabilityMicrobiology and stability: from Phase ILaboratory extraction, formulation and dryingLaboratory extraction, formulation and drying: from Phase IReceiving, quarantine and sampling (provisional)Receiving, quarantine and sampling: from Phase I (provisional assignment)LIMS and the quality management systemLIMS and the quality management system: from Phase IPilot extraction, evaporation and solvent recoveryPilot extraction, evaporation and solvent recovery: from Phase IIPilot spray, freeze and fluid-bed dryingPilot spray, freeze and fluid-bed drying: from Phase IIA second LC-MSA second LC-MS: from Phase IIWalk-in stabilityWalk-in stability: from Phase IIBulk raw-material milling (provisional)Bulk raw-material milling: from Phase II (provisional assignment)Commercial manufacturing and packaging linesCommercial manufacturing and packaging lines: from Phase IIIA commercial-scale dryerA commercial-scale dryer: from Phase IIIA warehouseA warehouse: from Phase IIIPhase I carries the scientific work from the start; Phases II and III add throughput and scale.Bars continue into later phases: capabilities accumulate. Dashed: provisional assignment pending founder confirmation.Capabilities added in each proposed phasePhase I · Laboratory coreProposed 2027 · 18,000 sq ftAnalytical coreMicrobiology and stabilityLaboratory extraction, formulation and dryingReceiving, quarantine and sampling (provisional)LIMS and the quality management systemGate 1: financing, demand, permits and evidencePhase II · Pilot processAfter Gate 1 · earliest 2029 · 42,000 sq ft cumulativePilot extraction, evaporation and solvent recoveryPilot spray, freeze and fluid-bed dryingA second LC-MSWalk-in stabilityBulk raw-material milling (provisional)Gate 2: financing, demand, permits and evidencePhase III · CommercialAfter Gate 2 · earliest 2031 · 72,000 sq ft cumulativeCommercial manufacturing and packaging linesA commercial-scale dryerA warehouseLater phases add throughput and scale to the Phase Ilaboratory core.
Phase contents, areas and earliest proposed timing as stated on this page. Phases are released by the gate conditions below, not by dates.
Text version of the three phases
Phase I · proposed 2027 · 18,000 sq ft

Laboratory core

Analytical core, microbiology and stability; laboratory extraction, formulation and drying; receiving, quarantine and sampling (provisional); LIMS and the quality management system.

Phase II · after Gate 1 · 42,000 sq ft cumulative

Pilot process

Pilot extraction, evaporation and solvent recovery; pilot spray, freeze and fluid-bed drying; a second LC-MS; walk-in stability; bulk raw-material milling (provisional).

Phase III · after Gate 2 · 72,000 sq ft cumulative

Commercial

Commercial manufacturing and packaging lines, a commercial-scale dryer and a warehouse.

Explanation, details and sources

Receiving and milling had no phase in the founder's plan. This site places sample receiving, quarantine, sampling and retained samples in Phase I, and bulk raw-material milling in Phase II, as a provisional assignment pending founder confirmation.

Staffing would follow the phases; no one besides the founder is hired. Planned roles: about the company.

What releases each phase

Each phase needs four things at once: financing, demonstrated demand, permits and evidence

Four conditions at every gate; what each requires grows from Phase I to Gate 2Proposed conditions
Four conditions, each required at all three gates: financing, demonstrated demand, permits and safety studies, and evidence and quality; the requirement grows from Phase I start to Gate 2. Proposed conditions.Phase I startPhase II (Gate 1)Phase III (Gate 2)FinancingCommitted funding for the Phase I build-outand operating period before a lease issignedFunding for pilot space and equipmentcommitted before orders are placedFunding for commercial lines committedbefore orders are placedDemonstrateddemandCustomer-discovery evidence and earlyletters of interestPaying accounts, signed backlog includingmanufacturing letters of intent, andlaboratory utilization at agreed thresholdsMinimum-volume or take-or-pay contractscovering a defined share of Phase IIIcapacityPermits and safetystudiesSite selection, zoning and building permits;hazardous-materials and fire-code reviewfor laboratory solvents and gasesFire-code review for pilot-scale flammablesolvents; air and wastewater permits asrequired; combustible-dust hazard analysisOccupancy and permits for manufacturing;updated hazard analysesEvidence and qualityQuality system written; equipmentqualification and method validation plansapprovedQuality system operating; methodsvalidated for offered tests; first ISO/IEC17025 scope submittedAn EUTECNIQ-developed ingredient with acompleted safety dossier and first orders;Part 111 and Part 117 programs operating
A phase would start when all four conditions are met, not when a date arrives. Restates the table below.
Show the table (4 rows)
ConditionPhase I startPhase II (Gate 1)Phase III (Gate 2)
FinancingCommitted funding for the Phase I build-out and operating period before a lease is signedFunding for pilot space and equipment committed before orders are placedFunding for commercial lines committed before orders are placed
Demonstrated demandCustomer-discovery evidence and early letters of interestPaying accounts, signed backlog including manufacturing letters of intent, and laboratory utilization at agreed thresholdsMinimum-volume or take-or-pay contracts covering a defined share of Phase III capacity
Permits and safety studiesSite selection, zoning and building permits; hazardous-materials and fire-code review for laboratory solvents and gasesFire-code review for pilot-scale flammable solvents; air and wastewater permits as required; combustible-dust hazard analysisOccupancy and permits for manufacturing; updated hazard analyses
Evidence and qualityQuality system written; equipment qualification and method validation plans approvedQuality system operating; methods validated for offered tests; first ISO/IEC 17025 scope submittedAn EUTECNIQ-developed ingredient with a completed safety dossier and first orders; Part 111 and Part 117 programs operating
Explanation, details and sources

Quantitative gate thresholds are part of the investor discussion and are not repeated here. See investor information. Nothing on this page is an offer of securities.

Timing

Floor area would step up at the gates, and the gates may bind later than planned

The solid line shows the earliest proposed timing. The dashed line shows an illustrative later path in which each gate is met about a year later than planned.

Cumulative proposed floor area by phase, with the gates that release each stepProposed timing
Show data
PhaseCumulative areaEarliest proposed startIllustrative later start
Phase I18,000 sq ft20272027
Phase II (after Gate 1)42,000 sq ft20292030
Phase III (after Gate 2)72,000 sq ft20312033
Management proposal. The later path is illustrative, not a forecast; either path depends on the four gate conditions above.
Area program

At full build, laboratories and the pilot plant would take less than half of the proposed 72,000 sq ft

Proposed 72,000 sq ft area program at full build, by functionArea program
Show data
GroupFunctionArea
LaboratoriesAnalytical chemistry and QC7,000 sq ft
LaboratoriesMicrobiology, stability and QA6,000 sq ft
LaboratoriesDiscovery and extraction labs5,000 sq ft
LaboratoriesFormulation R&D5,000 sq ft
Pilot plantPilot plant10,000 sq ft
Manufacturing and packagingCommercial manufacturing16,000 sq ft
Manufacturing and packagingPackaging7,000 sq ft
Warehouse, utilities, officesWarehouse9,000 sq ft
Warehouse, utilities, officesUtilities and EHS4,000 sq ft
Warehouse, utilities, officesOffices and training3,000 sq ft
Total72,000 sq ft
Laboratories 23,000 sq ft (32%); pilot plant 10,000 (14%); manufacturing and packaging 23,000 (32%); warehouse, utilities and offices 16,000 (22%). How much of each laboratory zone would be fitted out within Phase I's 18,000 sq ft has not been set.
What the program is, and is not

It is a functional allocation used to size utilities, staffing and equipment classes. It is not a lease, a site plan or a commitment to build.

Solvent-room occupancy, ethanol quantities and utility loads need an engineering study and review by the local fire authority before any layout is fixed.

Conceptual zoning

Zones would follow the material: raw botanicals in, separated laboratories in the middle, solvents and powders behind fire and dust controls

A conceptual adjacency diagram, not a floor plan. The table below it carries the same information as text, with the utilities and safety separation each zone would need.

Conceptual zoning and material flowConceptual · not to scale
Conceptual only. Adjacencies show intent: one-way flow from raw to finished material, a separated microbiology suite, and solvent and dust hazards kept behind rated separations. The table is the text alternative.

References: NFPA 30 (flammable and combustible liquids), NFPA 70 (National Electrical Code, hazardous locations), NFPA 652 (fundamentals of combustible dust); CDC/NIH, Biosafety in Microbiological and Biomedical Laboratories, 6th edition (2020). Applicability depends on the site, quantities and the local authority; these are planning references, not compliance claims.

Explanation, details and sources

Text version of the zoning diagram: each zone, its proposed phase and function, the utilities it needs and how it would be separated.

ZoneProposed phaseFunctionKey utilitiesSafety and separation
Receiving and quarantinePhase I · prov. Bulk milling · II · prov.Inspect, log, quarantine and sample incoming lots; mill bulk material for pilot work.Dock and scales; dust extraction at the sampling booth and mill.Raw botanicals kept apart from laboratories and finished product to limit dust, pest and microbial carry-over; quarantine status enforced physically or in the records.
Controlled storagePhase I Warehouse · IIIHold quarantined, released and rejected material separately; store retained and reserve samples.Temperature and humidity mapping with continuous monitoring.Flammable liquids in approved cabinets or a rated room within code-allowed quantities; incompatible chemicals segregated.
Analytical chemistryPhase IIdentity, composition and contaminant testing.Fume hoods and laboratory exhaust; nitrogen for LC-MS, argon for ICP-MS and carrier gases for GC; purified water; stable room temperature; backup power for instruments and data.Compressed-gas storage and monitoring; trace-metals work kept away from metal sources; solvent waste collection.
MicrobiologyPhase IMicrobial counts and tests for specified organisms.Biological safety cabinet, incubators, autoclave, dedicated handwashing.A separated suite with controlled access and gowning; pathogen tests handled under biosafety level 2 practices described in the CDC/NIH BMBL; airflow kept away from product areas.
FormulationPhase I Pilot vessels · IIEmulsions, dispersions and encapsulates; droplet sizing.Purified water; oil-free compressed air; chilled water for homogenizers.Powder dust control; noise control around high-pressure homogenizers.
Process developmentPhase ILaboratory extraction (ethanol–water, supercritical CO₂) and laboratory drying.Walk-in fume hoods; CO₂ supply; solvent recovery; dryer exhaust.Ventilation and CO₂ gas detection; electrical classification where flammable vapors can occur; pressure equipment with relief devices.
Pilot plantPhase IIPilot extraction, evaporation, solvent recovery and drying.Steam or hot water, chilled water, vacuum, nitrogen, compressed air, process water, solvent day tanks, wastewater.A fire-separated solvent area with hazardous-location electrical design; flammable liquids managed under the fire code; a dust hazard analysis for dried powders; inert-gas operation evaluated for drying solvent-bearing feeds.
Manufacturing and packagingPhase IIIBlending, encapsulation, packaging of released material.Filtered HVAC with pressure control; dust collection; compressed air.Combustible-dust controls; cross-contact controls for food lines; Part 111 and Part 117 operations kept distinct where both run.
Utilities, EHS and officesPhase I onwardPlant utilities, environmental health and safety, offices and training.Electrical service, water treatment, compressed air, chilled water.Hazardous-waste accumulation area for spent solvents; emergency equipment; access control.
Permits and studies

Permits and engineering studies would come before any layout is fixed; none has started

What would trigger each permit or study: seven requirements, six activitiesRules cited below
Six planned activities on the left and the seven permits or studies they would trigger on the right: solvents trigger a fire-code review and electrical classification, powders a dust hazard analysis, hazardous materials a business plan and building review, food handling FDA registration, emissions air and wastewater permitsActivity that would trigger itPermit or study (planned, not started)Fire-code review of flammable liquidsElectrical area classificationDust hazard analysisHazardous Materials Business PlanBuilding permit and occupancy reviewFDA food facility registrationAir and wastewater permitsFlammable solvents: ethanol extraction and solvent recoveryBotanical powders: milling, drying, blendingHazardous materials on siteLaboratory and pilot usesMaking or holding food, including supplementsSolvent emissions, dryers and process wastewater
Restates the permit table below, which cites the rule behind each item. None of these has started.
OSHA limits the container size for flammable liquids; ethanol (flash point 55 °F, boiling point 173 °F) is Category 2Regulation
Source: 29 CFR 1910.106(a)(19) categories (flash point below 73.4 °F and boiling point above 95 °F = Category 2), (d)(2)(iii) Table H-12 and (d)(3)(i) cabinets: not more than 60 gallons of Category 1–3 or 120 gallons of Category 4 per storage cabinet; eCFR, checked October 24, 2026. Ethanol values: NIOSH Pocket Guide to Chemical Hazards. Local fire codes set further limits per control area.
Data table
29 CFR 1910.106 Table H-12: maximum allowable size of containers and portable tanks for flammable liquids
Container typeCategory 1Category 2Category 3Category 4
Glass or approved plastic1 pt1 qt1 gal1 gal
Metal (other than DOT drums)1 gal5 gal5 gal5 gal
Safety cans2 gal5 gal5 gal5 gal
Metal drums (DOT specifications)60 gal60 gal60 gal60 gal
Approved portable tanks660 gal660 gal660 gal660 gal
Show the table (7 rows)
Permit or studyWhy it appliesStatus
Building permit and occupancy reviewLaboratory and pilot uses set the occupancy classification and the allowed quantities of hazardous materials per control area.Planned · not started
Hazardous Materials Business PlanCalifornia requires a plan, filed through the California Environmental Reporting System (CERS) with the local Certified Unified Program Agency, when a business handles at least 55 gallons of a liquid, 500 pounds of a solid or 200 cubic feet of a compressed gas (Health and Safety Code § 25507).Planned · not started
Fire-code review of flammable liquidsEthanol extraction and solvent recovery; quantities, storage and separation under the California Fire Code and NFPA 30.Planned · not started
Electrical area classificationRooms where flammable vapors can occur need classified electrical equipment (NFPA 70, Articles 500–505).Planned · not started
Dust hazard analysisMilling, drying and blending of botanical powders can create combustible dust (NFPA 652).Planned · not started
Air and wastewater permitsSolvent emissions, dryers and process wastewater, as the local air district and sewer agency require.Planned · not started
FDA food facility registrationRequired before a facility manufactures, processes, packs or holds food, including dietary supplements and dietary ingredients (21 CFR 1.225, 1.230).Planned · not started

Sources: eCFR, 21 CFR 1.225–1.230, current to Oct 21, 2026; Los Angeles Fire Department CUPA, "Hazardous Materials" (HMBP thresholds, HSC § 25507); CalEPA, California Environmental Reporting System; NFPA codes and standards pages for NFPA 30, 70 and 652. Not legal or engineering advice.

Explanation, details and sources

The list reflects California practice for a laboratory and pilot plant using flammable solvents, compressed gases and dried powders. Exact requirements depend on the site and the local authorities.

Equipment and cost status

Equipment is defined by class only: no specification is written and no quotation has been requested

Thirteen equipment classes by proposed phase; most laboratory classes would arrive in Phase IProposed
13 equipment classes by proposed phase: Liquid and thin-layer chromatography (HPLC, UHPLC, HPTLC), Phase I; Mass spectrometry (LC-MS/MS, high-resolution LC-MS, GC-MS), Phase I Second LC-MS · II; Elemental analysis (ICP-MS), Phase I; Microbiology (safety cabinet, incubators, autoclave), Phase I; Stability chambers (reach-in; walk-in), Phase I Walk-in · II; Laboratory extraction (supercritical CO₂, ethanol–water) and rotary evaporation, Phase I; Formulation (high-pressure homogenizer, particle sizing), Phase I; Laboratory drying (spray, freeze), Phase I; LIMS and electronic laboratory notebooks, Phase I; Bulk milling (hammer mill, sieves), Phase II · prov.; Pilot extraction, evaporation and solvent recovery, Phase II; Pilot drying (spray, freeze, fluid bed), Phase II; Commercial manufacturing, packaging lines and dryer, Phase III. No specification or quotation exists.Phase IPhase IIPhase IIILiquid and thin-layer chromatography (HPLC, UHPLC, HPTLC)Liquid and thin-layer chromatography (HPLC, UHPLC, HPTLC): Phase I; Class identified; no specification; no quotationMass spectrometry (LC-MS/MS, high-resolution LC-MS, GC-MS)Mass spectrometry (LC-MS/MS, high-resolution LC-MS, GC-MS): Phase I Second LC-MS · II; Class identified; no specification; no quotationMass spectrometry (LC-MS/MS, high-resolution LC-MS, GC-MS): Second LC-MS in Phase IIElemental analysis (ICP-MS)Elemental analysis (ICP-MS): Phase I; Class identified; no specification; no quotationMicrobiology (safety cabinet, incubators, autoclave)Microbiology (safety cabinet, incubators, autoclave): Phase I; Class identified; no specification; no quotationStability chambers (reach-in; walk-in)Stability chambers (reach-in; walk-in): Phase I Walk-in · II; Class identified; no specification; no quotationStability chambers (reach-in; walk-in): Walk-in in Phase IILaboratory extraction (supercritical CO₂, ethanol–water) and rotaryevaporationLaboratory extraction (supercritical CO₂, ethanol–water) and rotary evaporation: Phase I; Class identified; no specification; no quotationFormulation (high-pressure homogenizer, particle sizing)Formulation (high-pressure homogenizer, particle sizing): Phase I; Class identified; no specification; no quotationLaboratory drying (spray, freeze)Laboratory drying (spray, freeze): Phase I; Class identified; no specification; no quotationLIMS and electronic laboratory notebooksLIMS and electronic laboratory notebooks: Phase I; Class identified; no specification; no quotationBulk milling (hammer mill, sieves)Bulk milling (hammer mill, sieves): Phase II · prov.; Class identified; no specification; no quotationPilot extraction, evaporation and solvent recoveryPilot extraction, evaporation and solvent recovery: Phase II; Class identified; engineering study needed firstPilot drying (spray, freeze, fluid bed)Pilot drying (spray, freeze, fluid bed): Phase II; Class identified; engineering study needed firstCommercial manufacturing, packaging lines and dryerCommercial manufacturing, packaging lines and dryer: Phase III; Class identified; scope depends on contracts at Gate 2proposed phaseaddition in Phase IIprovisional
Restates the equipment table below. Cost estimates behind the plan are management order-of-magnitude assumptions; they are not published here and would be replaced by vendor quotations and an engineering study before any order.
Show the table (13 rows)
Equipment classZoneProposed phaseStatus
Liquid and thin-layer chromatography (HPLC, UHPLC, HPTLC)Analytical, identityPhase IClass identified; no specification; no quotation
Mass spectrometry (LC-MS/MS, high-resolution LC-MS, GC-MS)AnalyticalPhase I Second LC-MS · IIClass identified; no specification; no quotation
Elemental analysis (ICP-MS)AnalyticalPhase IClass identified; no specification; no quotation
Microbiology (safety cabinet, incubators, autoclave)MicrobiologyPhase IClass identified; no specification; no quotation
Stability chambers (reach-in; walk-in)StabilityPhase I Walk-in · IIClass identified; no specification; no quotation
Laboratory extraction (supercritical CO₂, ethanol–water) and rotary evaporationProcess developmentPhase IClass identified; no specification; no quotation
Formulation (high-pressure homogenizer, particle sizing)FormulationPhase IClass identified; no specification; no quotation
Laboratory drying (spray, freeze)Process developmentPhase IClass identified; no specification; no quotation
LIMS and electronic laboratory notebooksQuality and dataPhase IClass identified; no specification; no quotation
Bulk milling (hammer mill, sieves)ReceivingPhase II · prov.Class identified; no specification; no quotation
Pilot extraction, evaporation and solvent recoveryPilot plantPhase IIClass identified; engineering study needed first
Pilot drying (spray, freeze, fluid bed)Pilot plantPhase IIClass identified; engineering study needed first
Commercial manufacturing, packaging lines and dryerManufacturingPhase IIIClass identified; scope depends on contracts at Gate 2
Explanation, details and sources

Equipment the drawing in the proposed lab journey shows but the phase plan does not include (DNA barcoding, NMR, resin columns, membrane filtration, ultrasound-assisted extraction) is marked there as an external partner or not yet assigned.

Walk through the proposed laboratory

See how a sample would move through the Phase I core, the pilot plant and off-site partners, station by station.